Skip to content

Interval-versus-cumulative schedule performance intelligence

Finding
Executives needed schedule-variance visibility at two horizons — the reporting interval and the cumulative position.
Evidence
A VBA and Excel dynamic-arrays system produces both SPI perspectives and consolidates output to PDF without manual assembly.
Standard
Earned value trend analysis — SPI measured at interval and cumulative horizons.
Consequence
Schedule variance is read directly from consolidated packs each cycle.
Provenance
Role R-SBG — Saudi Binladin Group, April 2025 to present. Owner-verified account.

Last updated: