Interval-versus-cumulative schedule performance intelligence
- Finding
- Executives needed schedule-variance visibility at two horizons — the reporting interval and the cumulative position.
- Evidence
- A VBA and Excel dynamic-arrays system produces both SPI perspectives and consolidates output to PDF without manual assembly.
- Standard
- Earned value trend analysis — SPI measured at interval and cumulative horizons.
- Consequence
- Schedule variance is read directly from consolidated packs each cycle.
- Provenance
- Role R-SBG — Saudi Binladin Group, April 2025 to present. Owner-verified account.