Schedule reconstruction — baseline versus actual ​

A-100 · baseline
A-100 · reconstructed
A-200 · baseline
A-200 · reconstructed
A-300 · baseline
A-300 · reconstructed
A-400 · baseline
A-400 · reconstructed
A-500 · baseline
A-500 · reconstructed
Baseline vs. reconstructed position (months) — illustrative.

The figures shown are synthetic and illustrate the required format. They are not the result of a real analysis.

Data pipeline — extract to executive report ​

Extract Site records, XER exports, cost ledgers
Transform Python and Power Query — cleaning, coding, reconciliation
Model Power BI semantic model — WBS/CBS keys, measures
Report Executive dashboards — weekly and monthly cycles
Deliver COO, lead consultant, client PMO — one source of truth

The figures shown are synthetic and illustrate the required format. They are not the result of a real analysis.

Earned value — S-curve explorer ​

SPI 1.00 · CPI 1.00 at M12 (synthetic series)

The figures shown are synthetic and illustrate the required format. They are not the result of a real analysis.